Work begins on the exterior of the building, first by cleaning any old cracks, and then by applying a flexible polyurethane caulking that is blended to match the texture of the old stucco. Master carpenter Norm Abram repairs and updates the original front doors to the house, which were recently discovered in the basement. Inside, plastering contractor Karl Gross uses a reinforced plaster mix, mesh tape, and joint compound to patch the old plaster and prevent future cracks. Nearby, landscape contractor Roger Cook visits a colorful East Boston community garden. While back at the house, coatings specialist Scott Bennung shows host Kevin O'Connor how he's applying an elastomeric coating, rather than paint, to the stucco that will seal out water and provide a fresh, clean look for the house.
Tyler Perry plans to move to Puerto Rico, pulling back from work for a slower pace. Discover what this major life shift means for the filmmaker.
1 min ago
Net-A-Porter's Incredible Women party lit up NYFW at Thomas Straker's new SoHo spot. Inside the glamorous celebration of fashion's elite women.
2 days ago
Ryan Turek joins The Last Kiss as Executive Producer, strengthening the film's production team and creative direction. Get the latest crew update.
2 days ago
Lil Durk acquitted on all charges in LA murder-for-hire trial after 3 days of jury deliberation. Co-defendants convicted on stalking charges.
2 days ago
Discover why Drawn Together is trending: forbidden love, thrilling storytelling, and sequel buzz make this film a must-watch on streaming platforms now.
2 days ago