The framing crew continues working on the addition; a large steel beam to carry out the upper floor is lowered into place. A framer demonstrates a pneumatic tool for attaching metal hangers to wood. The guys lay down the second floor deck, using construction adhesive and tongue and groove plywood. Inside, we find Terry Maitland putting in a footing for the missing basement lally column. We then meet a lead paint inspector, who uses an x-ray machine to gauge the presence and concentration of lead paint in the old building. Tom Silva works on replacing the rotten and underframed back of the old building. We meet a lightning protection inspector from Underwriters Labs, who assesses the building's system.
Stream The Painter of Wind on Netflix from Nov 14, 2026. This 2008 Korean period mystery follows an art student uncovering a deadly truth.
14 mins ago
Jennifer Lawrence redefines power dressing in a sleek black blazer suit with lavender tee and velvet accessories—proof that business fashion can be polishe...
2 days ago
Jamie Campbell Bower is redefining red carpet menswear with daring cape coats and bold accessories on The Rings of Power press tour. See his most striking lo...
2 days ago
Trisha Paytas will host Don't Date Alone, a new queer dating series on Tubi where best friends pick the dates, as the streamer ramps up creator-led programming.
2 days ago
Ankama has launched a 12-episode Welsh & Shedar webtoon on Allskreen and the Ankama Launcher, six days after the animated series premiere, with a new episode weekly in four languages.
2 days ago